A large financial company has an existing vSAN 7.0 U1 cluster containing production virtual machines and the vCenter Server. The cluster needs to be physically moved to another location within the datacenter to allow new racks to be installed, so the platform needs to be powered down.

Which action should the vSAN administrator take to perform this procedure safely?