A systems architect has been asked to design the upgrade of a vSphere 5.5 to a 6.5 environment.
* The current vSphere environment has sites in Houston and New York, each with its own Single Sign-on domain.
* Each site also has a Windows vCenter Server
The business has requested these considerations during the upgrade design:
* One vSphere Single Sign-On domain
* vCenter Server configured in a highly available manner at each site
* reduce operating system licensing costs
* centralized repository for templates and ISOs
Which implementation order would satisfy these requirements?
Currently there are no comments in this discussion, be the first to comment!