DragDrop
A company has several applications that are being moved to a Horizon environment. An architect has been given several application types and is designing an environment to accommodate all of the applications.
List of applications:
WebSeller – a cloud-based application that is single sign-on capable.
RoloContact – a Windows application that utilizes an Internet Explorer 6 and an IE plugin, but needs to be deployed to Windows 8 desktops.
AppOffice – a group of Windows based application that needs to be deployed together to an existing View linked clone desktop pool for the remote sales team.
RelationCRM – a server-based application that is currently accessed via RDP.
Match each application with its appropriate deployment method.
DragDrop
A company has several applications that are being moved to a Horizon environment. An architect has been given several application types and is designing an environment to accommodate all of the applications.
List of applications:
WebSeller -- a cloud-based application that is single sign-on capable.
SalesCalc -- a Windows application that needs a very old version of Java and needs to be accessed offline.
AppOffice -- a group of Windows based application that needs to be deployed together to an existing View linked clone desktop pool for the remote sales team.
RelationCRM -- a server-based application that is currently accessed via RDP.
Match each application with its appropriate deployment method.
:
MultipleChoice
A company had a security breach which resulted in stolen dat
OptionsMultipleChoice
The IT team for a small government organization wants to deploy Horizon Apps.
It needs to provide Windows desktops to two groups of users.
Most users only need a few Windows applications.
It wants to minimize storage space required.
It determined that they need 4 RDS Hosts, but more will be needed in the next 6 to 8 weeks.
It installed and configured RDS on a Windows server VM, installed the Horizon Agent, and then the Windows applications.
What steps must the organization perform next to create a scalable and flexible Horizon Apps deployment?
OptionsMultipleChoice
A customer has chosen vRealize Operations Manager for Horizon as its monitoring solution.
The customer's requirements are:
Monitor the PCoIP metrics to address user experience complaints.
Minimum required resources should be used for monitoring purposes.
Recent project updates include:
vRealize Operations Manager is already in use for vSphere monitoring.
All desktop templates are created with Horizon 7 View agent and Horizon deployment is at the final stage of completion.
Existing vRealize Operations Manager capacity is already scaled out to meet the current requirements of Horizon 7 monitoring needs.
Which two additional components are required to make the monitoring systems ready? (Choose two.)
OptionsMultipleChoice
A company is deploying VDI and needs to meet these requirements:
Support a bring-your-own-device (BYOD) strategy
Support external contractors
Support access from anywhere
Reduce or eliminate costly desktop and laptop replacement
Which two solutions should an architect recommend? (Choose two.)
OptionsMultipleChoice
A hospital is looking to introduce a new work model. Their goal is to allow doctors and nurses to access care applications more flexibly. An important task is that Android and iOS tablets be allowed for hospital staff. The IT department is faced with the task of executing on the requirements.
The current client environment is:
Physical Windows 7 desktops and laptops
2500 Windows based applications
300 Web based applications, where 200 requires Internet Explorer
Windows applications are managed using Microsoft SCCM
Any solution must be in production within 6 months. IT was approved to start building a non-optimized solution to get things started. At a later date, investments will be spent on optimizing the solution. There is no time for a proper application assessment and user segmentation, so the solution must support as broad a user base as possible.
The main priorities for the design are:
Time to market
Change as little as possible of existing management processes
What solution would support the main priorities?
OptionsMultipleChoice
A company is using virtual desktops in full done, persistent mode, and using software distribution tools and scripts to deploy and install Windows-based applications. Windows based application deployment failures are mow on the rise and user downtime has increased.
The CIO has asked an architect to recommend a solution which meets these requirements:
Windows applications are to be available for use on iPads, zero clients, and Windows laptops
No more use of software distribution tools and scripts to install applications to users' virtual desktops
No streaming of applications to virtual desktops
What two changes to the environment should the architect recommended? (Choose two.)
OptionsMultipleChoice
An architect is working on a physical desktop replacement using Horizon View.
The architect gathered this information from the customer:
There are currently 500 physical desktops, all with traditional spinning hard drives.
Each desktop peaks at 75 IOPS multiple times during the day.
The average read/write ratio is 30% reads, 70% writes.
The architect decided to size the vSAN cluster to handle the workload using FTT=1 and Fault Tolerance Method of RAID-1.
Using only the information provided, what are the total calculated IOPS required for the vSAN cluster?
OptionsMultipleChoice
A customer is looking to implement a VMware solution with these requirements:
Support for 200 call center employees on a single 8-hour shift
Application access through physical Windows 7 desktops
Restrict access to only these applications: Google Chrome, FileZilla (an open source FTP application), and a custom in-house client-server call center application
An architect is tasked with determining the lowest cost license solution that will meet the customer's requirements.
Which solution should the architect choose?
Options