An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention. Which of the following Is an objective of this prerequisite?
The Erosion and Sedimentation Control Plan, required under the Green Infrastructure and Buildings Prerequisite for Construction Activity Pollution Prevention, primarily aims to prevent air pollution from dust and particulate matter generated during construction. This objective ensures that construction activities do not negatively impact air quality, particularly for neighboring communities. The plan also addresses soil erosion and sedimentation, protecting local waterways from sediment runoff, which can degrade water quality and harm aquatic ecosystems.