For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Show Suggested Answer Hide Answer
Suggested Answer: A, B, C

Contribute your Thoughts:

Fernanda
1 months ago
This question is like a game of 'Spot the Odd One Out'. D and E are clearly not part of the 'valid and consistent' requirements. I wonder if the exam will have any 'choose all that apply' questions too.
upvoted 0 times
Jacquelyne
20 days ago
C) The assigned routing and bill of material (BOM) must be valid in the entire validity period.
upvoted 0 times
...
Shonda
22 days ago
B) The lot size range must be within the lot size range of the assigned routing.
upvoted 0 times
...
Mitzie
24 days ago
A) The deletion flag must NOT be set for the bill of material (BOM) or the routing
upvoted 0 times
...
...
Bernadine
2 months ago
Hmm, I thought the lot size range was important too. Oh well, can't remember everything, I guess. Let's hope the exam doesn't have any trick questions!
upvoted 0 times
Cruz
28 days ago
C) The assigned routing and bill of material (BOM) must be valid in the entire validity period.
upvoted 0 times
...
Fletcher
29 days ago
B) The lot size range must be within the lot size range of the assigned routing.
upvoted 0 times
...
Rory
1 months ago
A) The deletion flag must NOT be set for the bill of material (BOM) or the routing
upvoted 0 times
...
...
Skye
2 months ago
I think D and E are also important. The routing must be a rate routing and should not have alternative sequences.
upvoted 0 times
...
Julianna
2 months ago
A, C, and E are the correct answers. The production version needs to be valid and consistent, which means the BOM and routing must be active, and the routing can't have alternative sequences.
upvoted 0 times
Francis
1 months ago
E) The assigned routing must NOT have alternative sequences
upvoted 0 times
...
Shawn
1 months ago
C) The assigned routing and bill of material (BOM) must be valid in the entire validity period.
upvoted 0 times
...
Antonio
2 months ago
A) The deletion flag must NOT be set for the bill of material (BOM) or the routing
upvoted 0 times
...
...
Loreen
2 months ago
I agree with Rolland. The deletion flag must not be set, lot size range must match the routing, and the routing and BOM must be valid.
upvoted 0 times
...
Rolland
2 months ago
I think the requirements for a valid and consistent production version are A, B, and C.
upvoted 0 times
...