BlackFriday 2024! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

SAP Exam C_TS414_2021 Topic 1 Question 20 Discussion

Actual exam question for SAP's C_TS414_2021 exam
Question #: 20
Topic #: 1
[All C_TS414_2021 Questions]

Which object must combined in test scheduling in the stability study Correct 3

Show Suggested Answer Hide Answer
Suggested Answer: B, D, E

Contribute your Thoughts:

Jess
5 months ago
Hmm, this question is as stable as a wobbly table. I'd go with E) Physical samples, but I'm not putting any money on it!
upvoted 0 times
Della
4 months ago
I agree, let's go with that option.
upvoted 0 times
...
Quentin
4 months ago
I think E) Physical samples is the way to go.
upvoted 0 times
...
...
Leontine
5 months ago
This is a tough one, but I'm leaning towards D) Inspection plans. Gotta make sure you're keeping a close eye on things throughout the process.
upvoted 0 times
Miriam
4 months ago
Yeah, I agree. It's important to have a solid plan in place for inspections.
upvoted 0 times
...
Lauran
4 months ago
I think you're right, D) Inspection plans are crucial for keeping track of everything.
upvoted 0 times
...
...
Merrilee
5 months ago
C) Initial sample is the way to go. You gotta start with the basics, right? That's the foundation for the whole study.
upvoted 0 times
Carmelina
4 months ago
E) Physical samples are necessary for conducting the actual tests in the study.
upvoted 0 times
...
Verda
4 months ago
C) Initial sample is crucial for setting the groundwork for the stability study.
upvoted 0 times
...
Ty
5 months ago
A) Physical drawing procedure is also important to ensure accuracy in the testing process.
upvoted 0 times
...
...
Bernardine
5 months ago
I'm going with B) Strategy. Having a solid plan in place is crucial for ensuring the stability study runs smoothly.
upvoted 0 times
Zita
5 months ago
D) Inspection plans are essential to ensure the testing process is thorough and well-documented.
upvoted 0 times
...
Roxane
5 months ago
I agree, but I believe E) Physical samples should also be combined for accurate results.
upvoted 0 times
...
Tommy
5 months ago
I think C) Initial sample is important to include in test scheduling for stability study.
upvoted 0 times
...
...
Talia
5 months ago
I believe initial sample should also be combined in test scheduling for accurate results.
upvoted 0 times
...
Lore
5 months ago
I agree with Natalya. Physical samples are crucial in stability studies.
upvoted 0 times
...
Daren
6 months ago
I think the answer is E) Physical samples. That seems like the most logical choice for test scheduling in a stability study.
upvoted 0 times
Odelia
5 months ago
Yes, physical samples are crucial for conducting accurate tests in a stability study.
upvoted 0 times
...
Vincenza
5 months ago
I agree, E) Physical samples are essential for test scheduling in a stability study.
upvoted 0 times
...
Ryan
5 months ago
I agree, Physical samples are essential for test scheduling in a stability study.
upvoted 0 times
...
Jettie
5 months ago
Yes, physical samples are essential to ensure accurate and reliable results in the study.
upvoted 0 times
...
Pamella
5 months ago
I agree, E) Physical samples are crucial for test scheduling in a stability study.
upvoted 0 times
...
Onita
5 months ago
I think the answer is E) Physical samples.
upvoted 0 times
...
...
Natalya
6 months ago
I think the object that must be combined in test scheduling is physical samples.
upvoted 0 times
...
Yasuko
6 months ago
I believe initial sample should also be combined in test scheduling for accurate results.
upvoted 0 times
...
Carlee
6 months ago
I agree with Physical samples are crucial in stability studies.
upvoted 0 times
...
Tien
6 months ago
I think the object that must be combined in test scheduling is physical samples.
upvoted 0 times
...

Save Cancel