Resource types RT01 and RT02 are assigned to resource execution constraint A1, with a maximum number of two and three respectively. REC storage group GAN is assigned to constraint A1 with the parameter "AND". Which is meaningful sentence is correct?

Please choose the correct answer

Response:

Show Suggested Answer Hide Answer
Suggested Answer: D