PMI Exam PMI-SP Topic 7 Question 64 Discussion

Actual exam question for PMI's PMI-SP exam
Question #: 64
Topic #: 7
[All PMI-SP Questions]

Which of the following components of the change control system includes the documentation, tracking systems, and defined approval levels necessary for authorizing and controlling changes?

Show Suggested Answer Hide Answer
Suggested Answer: A

The float for Activity I is three days. The early start for Activity I is Day 17 and the late start for

Activity I is Day 20. Therefore, the difference of

the early start and the late start reveals the float as three days. It is possible, and acceptable, to use

the difference of the early finish and the late finish to find the float, as the value will be the same

amount. Answer options B, D, and C are incorrect. These are not the valid calculation for the total

float.


Contribute your Thoughts:

Scarlet
3 days ago
I think the answer is D) Integrated Change Control.