A prospect has 8500GB of capacity provisioned for a non-production VMware cluster. As Part of migrating to Nutanix. the prospect agrees to convert any thick provisioned disks to thin provisioned disks. Based on additional dat
a. the total active working set for the cluster has been datermined to be 1TB. When entering the Raw input workload into Sizer, what is the minimum amount of HDD Capacity required for the workload? ??
An SE needs to leverage Change Block Tracking when using Xtract to migrate VMs from ESXi to AHV.
Which two source VM requirements should the SE verify? (Choose two)
A prospect has 8500GB of capacity provisioned for a non-production VMware cluster. As Part of migrating to Nutanix. the prospect agrees to convert any thick provisioned disks to thin provisioned disks. Based on additional dat
a. the total active working set for the cluster has been datermined to be 1TB. When entering the Raw input workload into Sizer, what is the minimum amount of HDD Capacity required for the workload? ??
A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)
A prospect is conducting a Nutanix POC process that will measure the time to revocer from a power loss, the impact of running multiple workloads on the same cluster, and peak storage performance. The POC results will be presented to the CIO.
How can this be achieved with the least room for error?
Jules
4 months agoJulio
5 months agoErasmo
6 months agoKatina
6 months ago