Question #: 4
Topic #: 1
[All NCSC-Level-1 Questions]

A consultant finishes creating a new ESXi cluster. The consultant connects to the nodes via laptop and a personal flat switch. The host/CVM network is on VLAN 23. The customer has the native VLAN on the ToR switches set to 23.

The customer wants to use LACP. Before placing the nodes on the customer network, the consultant tags VLAN 23 for each host and CVM. The consultant connects the nodes to the customer network and finds that they are unreachable.

What is causing this issue?

Show Suggested Answer Hide Answer
Suggested Answer: B

Contribute your Thoughts:

Sofia Colunga
2 years ago
"Keep the vSwitchNutanix, the vmkernel port (vmk-iscsi-pg), and the Nutanix Controller VM's virtual machine port group (svm-iscsi-pg) configuration intact. It should remain as a standard vSwitch and should not be migrated over to the VMware Distributed Switch (vDS). Migrating the vSwitchNutanix to the vDS causes issues with upgrade, and also controller VM data path communication." https://portal.nutanix.com/page/documents/kbs/details?targetId=kA0600000008SCECA2
upvoted 1 times
...