A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.

Which configuration is causing this issue?

Show Suggested Answer Hide Answer
Suggested Answer: D