You are deploying an 8-node AFF A700 by using BES-53248 cluster switches. During the installation, you notice that ports higher than 16 are not coming online. You verify that the additional licenses are installed.
Which two additional steps must be taken to bring the additional ports online? (Choose two.)
Click the Exhibit button.
You are installing a new AFF All SAN Array A700 HA pair.
Referring to the exhibit, which IP address would have been used to join node 02 to the cluster during setup?
Click the Exhibit button.
Immediately after installing a 4-node FAS8200 cluster, you discover that node, ''cluster1-02'', must be removed from the cluster. You want to use the cluster remove-node command to remove the node.
Referring to the exhibit, which two statements are correct? (Choose two.)
Click the Exhibit button.
You want to add an AFF A400 system to an existing 4-node cluster.
Referring to the exhibit, which number points to the ports that are used to cable the new nodes to the cluster interconnect switches.
Your customer plans to expand a 2-node FAS2750 switched cluster with two new controllers.
In this scenario, which two prerequisites should you examine in advance? (Choose two.)
Xenia
13 days agoSilvana
23 days agoCletus
27 days agoDudley
1 months agoNorah
1 months agoDeja
2 months agoRoyal
2 months agoLenny
3 months agoMari
3 months agoSabrina
3 months agoAdelina
3 months agoRosendo
4 months agoMargret
4 months agoPamella
5 months ago