Question #: 7
Topic #: 5
[All NS0-182 Questions]

You complete a hardware installation on a CN1610 switch and establish a serial connection to the RJ45 port.

In this scenario, the established serial connection allows the installer to complete which two tasks for the switches initial configuration? (Choose two.)

Show Suggested Answer Hide Answer
Suggested Answer: A, D