Your backbone network has a single dark fiber between two backbone sites within the same metro are
a. Currency this link is being used as a point-to-point 100ObE link between the routers using gray optics. The link has been experiencing high utilization and you are asked to propose network design changes to increase capacity across this network segment.
Which statement is true in this scenario?
Currently there are no comments in this discussion, be the first to comment!