When should component integration tests be carried out?

Show Suggested Answer Hide Answer
Suggested Answer: D

Component integration tests are designed to verify the interactions and interfaces between integrated components. These tests should be carried out after component testing (where individual components are tested in isolation) but before system testing (where the entire system is tested as a whole). This ensures that any issues arising from the integration of components are identified and resolved early in the testing process, making option D the correct answer.


Contribute your Thoughts:

Ashlyn
6 months ago
I believe integration tests should be done before system tests to catch any issues early on.
upvoted 0 times
...
Brandon
6 months ago
I disagree. Integration tests can be done before or after system tests, depending on the project requirements.
upvoted 0 times
...
Alline
7 months ago
I agree with Desirae. It makes sense to ensure individual components work before integrating them.
upvoted 0 times
...
Desirae
7 months ago
I think integration tests should always be done after system tests.
upvoted 0 times
...
Veta
7 months ago
I always do integration tests after system tests, to make sure everything is working together properly.
upvoted 0 times
...
Latosha
7 months ago
I think it depends on the project, but generally I agree with
upvoted 0 times
...
Harley
7 months ago
I disagree, I believe integration tests can be done before or after system tests.
upvoted 0 times
...
Mozell
7 months ago
I think integration tests should be done before system tests.
upvoted 0 times
...
Ashleigh
8 months ago
Haha, I think the exam designers are trying to trick us with these options. They're all technically correct in some scenarios, but we need to choose the best one.
upvoted 0 times
...
Rosendo
8 months ago
I'm with Vonda on this one. Option C seems the most flexible and practical approach. Integration tests can happen at different stages, as long as they're thorough.
upvoted 0 times
Della
7 months ago
I agree, integration tests can be done before or after system tests.
upvoted 0 times
...
Annmarie
7 months ago
I think Option C is the most flexible approach.
upvoted 0 times
...
...
Gretchen
8 months ago
Option D seems a bit too absolute, don't you think? I'm not sure integration tests should 'always' be done before system tests. It depends on the project, really.
upvoted 0 times
...
Vonda
8 months ago
Hmm, I'm leaning towards option C. It makes sense that integration tests can be done before or after system tests, depending on the project's needs and the development lifecycle.
upvoted 0 times
...
Carri
8 months ago
Yes, I agree. Integration tests focus on how different components of the system work together, while system tests look at the overall functionality of the complete system.
upvoted 0 times
...
Jamal
8 months ago
I think this question is a tricky one. We need to really understand the difference between integration tests and system tests to answer it correctly.
upvoted 0 times
...