A customer has an E870 that is currently using Elastic Capacity on Demand (CoD) for processors and memory. They have used all of their available processor enablement days. What is the correct process to give them more enablement days?
A customer is considering implementing Nova link for critical Enterprise workloads.
Where will Nova link run?
A customer has a 40 core E870 and would like to use Mobile Capacity on Demand. What is the minimum number of static processor activations that are required?
A customer with a Power 780 (9179-MHD) is considering a model conversion to the Power E8SO (9119-MH E). They currently have Elastic COD enabled.
Which of the following steps will need to be completed for them to continue using Elastic COD on the E880?
A stockbroker runs their high speed trading application on a standalone Linux system. They would like to consolidate the trading workload onto an existing VIOS managed Power E870. A single 10Gb Ethernet adapter is used for all the existing partitions. Which of the following satisfies the customer requirement for minimum network latency for the trading workload?