Cyber Monday 2024! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

IBM C2150-609 Exam Questions

Status: RETIRED
Exam Name: IBM Security Access Manager V9.0 Deployment
Exam Code: C2150-609
Related Certification(s): IBM Security Access Manager V9.0 Certification
Certification Provider: IBM
Actual Exam Duration: 105 Minutes
Number of C2150-609 practice questions in our database: 69 (updated: 18-03-2022)
Expected C2150-609 Exam Topics, as suggested by IBM :
  • Topic 1: Monitor IBM support website for bulletins and fixpacks; apply as necessary/ Prepare an external high volume database for use with ISAM
  • Topic 2: Navigate to and view logs on the appliance and look for relevant messages/ Prepare and install the appliance in different virtual environments
  • Topic 3: Maintain SSL keystores, including identifying expired certificates/ Demonstrate an understanding of various backup and recovery strategies
  • Topic 4: Apply detailed network design principles, including appropriate subnets interface/ Configure Web Components - Runtime and Reverse Proxy using LMI and REST API
  • Topic 5: Prepare for rack space, power, cabling, and management interface IP/ Configure the Advanced Access Control Module using LMI and REST API
  • Topic 6: Monitor critical performance metrics and availability, including events and alerts/ Demonstrate a knowledge of the features and capabilities of the ISAM Base
  • Topic 7: Examine and tune settings, including advanced parameters for TCP/IP/ ISAM Advanced Access Control Module, and ISAM Federation Module
  • Topic 8: Configure highly available ISAM environments using clustering/ Demonstrate knowledge of ISAM deployment patterns
  • Topic 9: Setup DNS, time, license, activation, firmware, and fixpack levels at the initial installation/ Configure Federation Components using LMI and REST API
  • Topic 10: Use the ISAM stop, start, failover features to aim for limited down-time during maintenance slots/ Create custom roles for delegated administration of the ISAM appliance functionality
Disscuss IBM C2150-609 Topics, Questions or Ask Anything Related

Currently there are no comments in this discussion, be the first to comment!

Free IBM C2150-609 Exam Actual Questions

Note: Premium Questions for C2150-609 were last updated On 18-03-2022 (see below)

Question #1

The IBM Security Access Manager (ISAM) V9.0 LMI SSL certificate is auto-generated by default.

When the LMI certificate is due to expire, how is it renewed?

Reveal Solution Hide Solution
Correct Answer: C

Question #2

The customer currently maintains all its users in Active Directory. As part of its new IBM Security Access Manager (ISAM) V9.0 deployment, the customer understands it will have to implement the ISAM "Global Sign-on (GSO)" to achieve SSO with certain backend applications which do their own authentication and cannot be modified.

Which federated repositories configuration will address the customer requirements?

Reveal Solution Hide Solution
Correct Answer: B

Question #3

A customer has three LDAP servers: A master (ds1.example.com), another master (ds2.example.com) and a read-only replica (ds3.example.com) used for IBM Security Access Manager (ISAM) V9.0. The deployment professional has configured the ISAM runtime using ds1.example.com as the registration server.

Which configuration will provide load balancing for LDAP read across all three servers and failover to ds2.example.com for LDAP write?

Reveal Solution Hide Solution
Correct Answer: A

Question #4

An attacker has compromised the private key associated with a certificate.

Which two methods can be used to ensure that certificates have not been revoked by the Certification authority that issued it? (Choose two.)

Reveal Solution Hide Solution
Correct Answer: D, E

Question #5

A large bank has multiple applications protected by two identically configured WebSEAL servers. One junction supports a reporting application that frequently experiences performance issues which slows response time. The worst case results in the entire site becoming unresponsive when all WebSEAL worker threads on all WebSEAL instances are consumed on the Junctions to this one reporting application.

Which configuration change will prevent this situation from occurring without impacting the behavior of any other application (junction), and keeping the entire site up?

Reveal Solution Hide Solution
Correct Answer: A


Unlock Premium C2150-609 Exam Questions with Advanced Practice Test Features:
  • Select Question Types you want
  • Set your Desired Pass Percentage
  • Allocate Time (Hours : Minutes)
  • Create Multiple Practice tests with Limited Questions
  • Customer Support
Get Full Access Now

Save Cancel