A Windows server D: drive is being archived using IBM Spectrum Protect on a weekly basis and the data is being retained on tape storage pool for period of 180 days.
As per changes suggested by the compliance team, the data on D: drive is now required to be protected on a daily basis and retained for a period of 90 days. To address this requirement, the methodology needs to be moved from Archive to Progressive Incremental.
The existing default management class WEEKLYARCHIVE containing the archive copy group is deleted and a new default management class DAILYBACKUP containing backup copygroup is created.
In this situation what would the retention be for the data already being archived in IBM Spectrum Protect?
The server uses the archive retention grace period to manage archive copies of files when either of the followingconditions occur:
References: http://www-01.ibm.com/support/docview.wss?uid=swg21681511
Currently there are no comments in this discussion, be the first to comment!