As shown in the figure, in the dual-link cold backup load balancing networking, as shown in the figure, AP1 is online, and AC1 and AP1 establish a primary line. After AP1 is disconnected from the AC1 link, the following conditions are normal. At what time point may the active/standby switchover occur?
Currently there are no comments in this discussion, be the first to comment!