Refer to the exhibit.
A network administrator evaluates a deployment to validate that users are assigned to the proper roles. Based on the output shown in the exhibit, what can the network administrator conclude?
Refer to the exhibits.
Exhibit 1
Exhibit 2
Exhibit 3
A network administrator deploys a Mobility Master (MM) pair with the VRRP VIP equal to 10.254.10.214, and attempts to associate MC1 to it. At first, the integration appears to be successful. However after a few minutes the network administrator issues the show switches command and sees that the MC1 is down, even though the device is up and running.
Every time the network administrator reboots the Mobility Controller (MC), the MC shows as being up and then it shows as being down. The network administrator gathers the information shown in the exhibits.
What should the network administrator do to resolve this problem?
Company 1 and Company 2 are medium-sized companies that collaborate in a joint venture. Each company owns a building, and each has their own ArubaOS 8 Mobility Master (MM)-Mobility Controller (MC) deployment. The buildings are located in front of one another. For the initial stage of the project, the companies want to interconnect their networks with fiber, and broadcast each other's SSIDs.
These are the requirements:
Do not unify the company's network management responsibilities.
Allow each company to take care of their own SSID setups when broadcasted in the other building.
Terminate Company 1 user traffic on Company 1 MCs when they connect to Company 2 APs.
Terminate Company 2 user traffic on Company 2 MCs when they connect to Company 1 APs.
What is needed to meet the solution requirements?
Refer to the exhibit.
After a recent power outage where MM1 is located, the network administrator could not perform configuration tasks on Mobility Controllers (MC) for several hours. The network administrator decides to acquire another Mobility Master (MM) and deploy L2 MM redundancy. The new MM is assigned the 10.254.10.15 IP address and VRRP is configured in both units. The network administrator verifies that VRRP is running, and prepares to complete the setup with the following scripts.
Which configuration tasks must the network administrator do before applying the script in order to successfully deploy L2 MM redundancy and prevent any other control plane outage?
Refer to the exhibits.
Exhibit1
Exhibit 2
Based on outputs shown in the exhibits, what is the reason that AP12 is seen by two different controllers?