A customer wants to remove nodes from an existing ESXi cluster using the HPE OneView for vCenter Server.
What must be done before this functionality can be used?
How can an integrator increase the efficiency with which a Synergy solution can be provisioned? (Choose two.)
A customer wants to boot Synergy compute nodes from external LUN located on HPE MSA 2050 SAN Storage.
What should an integrator consider when implementing this configuration?
An integrator is performing an initial Synergy setup.
How should the integrator initiate the hardware discovery?
A customer has the following configuration:
Frame 1
* Bay 1 -- HPE Synergy 12Gb SAS Connection Module
* Bay 2
* Bay 3 -- HPE Virtual Connect SE 40 GB F8 Module
* Bay 4 -- HPE Synergy 12GB SAS Connection Module
* Bay 5
* Bay 6 -- HPE Synergy 10 Gb Interconnect Link Module
Frame 2
* Bay 1 -- HPE Synergy 12Gb SAS Connection Module
* Bay 2
* Bay 3 -- HPE Synergy 10Gb Interconnect Link Module
* Bay 4 -- HPE Synergy 12Gb SAS Connection Module
* Bay 5
* Bay 6 -- HPE Virtual Connect SE 40Gb F8 Module
How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)
How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)