Refer to the exhibit.
A customer has received a second frame for their HPE Synergy environment. The customer has added the second frame to the rack and correctly cabled the power and management ring.
Based on the design shown, which changes need to be made to the configuration to ensure high availability? (Choose two.)
Currently there are no comments in this discussion, be the first to comment!