An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application. The architect originally proposed the following:
m710cartridges
HPE 45XGc switches
HPE 4-QSFP+ Uplink Modules
The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage.
Cartridge nodes needs two 10GbE ports each.
What does the architect need to replace in the solution to meet the customer's new requirements?