An Isilon customer has two 5-node clusters; one for production and one for disaster recovery (DR). The customer's workflows are replicated to the DR cluster through SyncIQ on individual schedules. They shut down their production cluster for a scheduled DR test, failed over to the DR cluster, and continue their DR testing.

Assume both clusters have identical shares, exports, and user authentication. Additionally, assume the client applications have been stopped and the DNS re-pointed. Which SyncIQ Policy method should be used to continue production operations?

Show Suggested Answer Hide Answer
Suggested Answer: B

Contribute your Thoughts:

Sabina
10 months ago
I'm not sure, but I think C) 5 might be the correct answer to maintain quorum and write access.
upvoted 0 times
...
Burma
10 months ago
I agree with Oneida, B) 4 makes sense to me too.
upvoted 0 times
...
Oneida
10 months ago
I disagree, I believe the answer is B) 4 because having at least half of the nodes up ensures quorum.
upvoted 0 times
...
Rikki
10 months ago
I think the answer is A) 2 because only a majority of the nodes need to be up.
upvoted 0 times
...
Mabelle
11 months ago
I agree with Peggie, C) 5 makes sense for ensuring write access.
upvoted 0 times
...
Peggie
11 months ago
No, I believe it's C) 5 because we need a majority of nodes to maintain quorum.
upvoted 0 times
...
Alonso
11 months ago
I think the answer is A) 2.
upvoted 0 times
...