Dell EMC Exam D-XTR-DY-A-24 Topic 2 Question 20 Discussion

Actual exam question for Dell EMC's D-XTR-DY-A-24 exam
Question #: 20
Topic #: 2
[All D-XTR-DY-A-24 Questions]

In an XtremIO X2-R four X-Brick cluster, how many total rack units should be left for the Cable Management ducts?

Show Suggested Answer Hide Answer
Suggested Answer: C

For an XtremIO X2-R four X-Brick cluster, the total number of rack units that should be left for the Cable Management ducts (CMD) is 4U1. This is based on the specifications provided by Dell EMC, which indicate that the Cable Management ducts are optional and, when included, require 2U of rack space for a two-brick cluster. Therefore, for a four-brick cluster, it would be logical to double the space to 4U to accommodate the additional cabling and ensure proper cable management1.

The process for allocating space for CMDs involves:

Reviewing Specifications: Check the official XtremIO X2 specifications to determine the space requirements for CMDs.

Allocating Rack Space: Based on the specifications, allocate the necessary rack units for CMDs within the customer's rack.

Installing CMDs: Install the CMDs in the allocated space to manage the cables effectively.

Organizing Cables: Arrange and secure the cables within the CMDs to ensure a neat and organized cable layout.

Verifying Installation: Confirm that the CMDs are installed correctly and that all cables are managed properly without any strain or interference.


Contribute your Thoughts:

Paris
9 days ago
8U? Seriously? I think the engineers at XtremIO have a bit too much time on their hands if they're allocating that much space just for cables.
upvoted 0 times
...
Titus
10 days ago
6U seems a bit excessive, but hey, better safe than sorry when it comes to cable management, am I right?
upvoted 0 times
...
Temeka
15 days ago
I'm going to go with 4U. That sounds about right for cable management in a four X-Brick cluster.
upvoted 0 times
...
Leota
17 days ago
I think the answer is A) 2U.
upvoted 0 times
...