BlackFriday 2024! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

CIMA Exam CIMAPRO19-P02-1 Topic 6 Question 18 Discussion

Actual exam question for CIMA's CIMAPRO19-P02-1 exam
Question #: 18
Topic #: 6
[All CIMAPRO19-P02-1 Questions]

A company currently absorbs production overheads based on labor hours. The overheads absorbed by the two products that are made, L and M, are $4 per unit and $10 per unit respectively. These were based on the budgeted overheads of $7,000 and budgeted labor hours of 1,750. The budgeted output was 500 units of each product.

The company is investigating the use of activity based costing (ABC). Analysis has shown that the total production overheads of $7,000 are made up of $4,000 for set up costs and $3,000 for inspection costs. The cost driver for set up costs is the number of set ups and for inspection costs it is the number of inspections.

The cost driver rate for set ups is $160 per set up. Product L would need 5 production runs. Both types of product would need 1 set up for each production run.

Product L would need 2 inspections for each production run. Product M would need 1 inspection per production run.

The products are made in the same department and use the same equipment and staff but they are produced separately.

Which of the following statements are correct?

Select ALL that apply.

Show Suggested Answer Hide Answer
Suggested Answer: A

Contribute your Thoughts:

Currently there are no comments in this discussion, be the first to comment!


Save Cancel