An A/B test has been running on a page with very high traffic for longer than the estimated duration as previously determined using the Sample Size Calculator. The confidence level is at 96%. However, the lift for the Experience B is very small, at just 0.6%.
What can be concluded for the test?
Currently there are no comments in this discussion, be the first to comment!